 |
|
 |
 |
- Prepare
Detailing
Estimate
based on units, hourly, or lump sum.
- Prepare project
Detailing
Schedule.
- Prepare
and Check
3D Model
of Structure in SDS/2.
- Prepare Advanced Bill
of Material
if required.
- Prepare
issue and
track Connection
Designs if
required.
- Prepare
issue and
track Request
for Information
queries if
required.
- Prepare
issue and
track Change
Orders if required.
- Prepare Shop
and Erection
Detail Drawings.
- Prepare
Gather Drawings
of the parts.
- Prepare
Bill of Material
Export File
for Fabricator's
use.
- Prepare
CNC Files
tailored
to the Fabricator's equipment.
- Prepare Field
Bolt Placement
List and
Summaries
for all Field
Bolts.
|
 |
|
 |